Your AI Future Is Being Held Hostage by a Power Plant From 1975
AI’s exponential growth is crashing into a linear reality: the electrical grid. Every data center built after 2025 will face a 4–7 year wait for power interconnection. The real bottlenecks aren’t GPUs or algorithms—they’re utility commissions, NIMBY protests, and a permitting system designed for a slower century. This article exposes the infrastructure crisis that could trigger the next AI winter.